
Kitchen and interior remodel
East Petersburg, PA
View case study · 7 photos
We take bathrooms down to the studs and rebuild them dry: tub-to-shower conversions, full gut remodels and accessible bathrooms across Dauphin, Cumberland, York and Lancaster counties. Licensed, insured, and priced in writing before demolition day.

Everything a homeowner shops for in a bathroom — the tile, the vanity, the fixtures — sits on top of work nobody ever sees. The shower pan, the membrane, the blocking and the ventilation decide whether the room still looks right in fifteen years or starts coming apart in five.
That is where we spend our attention. We open the walls, straighten framing that has been out of plumb since the Eisenhower administration, replace soft subfloor instead of tiling over it, run a real exhaust duct to the outside, and waterproof the whole wet area as a system rather than trusting grout to keep water out. Then the finishes go on, and they stay put.
Most of the homes we work in around Middletown, Steelton, Hummelstown and the older Harrisburg neighbourhoods were built with a single 5 x 8 bathroom and cast-iron drains. We have opened enough of them to know what is usually waiting behind the tile before we quote the job.
Plenty of clients have us do the kitchen remodel in the same stretch of work, or fold the bath into a wider interior renovation. When the house has no room to give, a bathroom sometimes comes out of a small addition off the back instead.
This is the most requested bathroom project in Central PA, and the drawing explains it better than a paragraph can. Same footprint, same door, entirely different room.
Eight layers stand between your shower and the framing. Every failed tile job we are called to look at is missing one of them.
Almost every bathroom we quote is one of these three. Each has its own timeline and its own thing that catches people off guard.
New vanity and top, toilet, mirror, light, floor tile and paint, with the plumbing staying where it is.
Typical timeline: 3 to 6 days
What usually surprises people: The floor under the old toilet. In older Middletown homes the subfloor around the flange is often soft and has to come out before new tile goes down.
Gut to the studs, new tub or curbless shower, waterproofed tile walls, vanity, exhaust fan, lighting and flooring.
Typical timeline: 2 to 3 weeks
What usually surprises people: Ventilation. A lot of these baths have no fan or one vented into the attic, and correcting that is what stops the paint from peeling again.
Larger footprint, double vanity, separate shower with a bench and niches, sometimes a freestanding tub and a linen wall.
Typical timeline: 3 to 5 weeks
What usually surprises people: Electrical capacity. Heated floors, a bigger fan, dedicated vanity circuits and lighting add up, and a full panel means a service upgrade.
A good share of our bathroom work is for people who intend to stay in their house. Done at the same time as a remodel, the changes that make a bathroom safe cost very little and look like nothing more than a well-built room.
We put solid blocking in the walls on every bath we gut, whether or not grab bars go in that year, because doing it later means opening finished tile. If a family member already uses a walker or a wheelchair, tell us early — door width, turning space and the vanity apron all get planned around it rather than adjusted afterward.
No lip to step over, and no shower door to pull open. The floor slopes to a linear drain at the wall.
Solid backing at the entry, beside the toilet and on the long shower wall so bars can be added anywhere later.
Toilets and vanities set a couple of inches taller, which is easier on knees and backs for everyone.
Lever door handles, single-lever valves and a thermostatic mixer that will not scald when a tap runs elsewhere.
Brighter, more even lighting and a floor that contrasts with the wall, so edges read clearly.
Actual photographs from our jobs. See the finished spaces and the details in each case study.
Send photos or the room dimensions and we'll come measure. You get a fixed written scope before anything is torn out.