Kitchen and interior remodel
East Petersburg, PA
View case study · 7 photos
Basement finishing, flooring, trim and millwork, walls opened up, drywall and finish work — and whole-home remodels that tie all of it together. One family-owned crew, a written scope, and a fixed price before we start.

An interior renovation is any project that reworks the house you already have instead of building past its walls. That covers a lot of ground: finishing a basement, opening a kitchen into the living room, new floors and trim through a whole floor, or a whole-home remodel that touches every room in turn.
The rooms people ask about most are the kitchen and the bathroom, and those are deep enough trades to have their own pages — see how we run a kitchen remodel or a bathroom renovation. Everything around those rooms lives here.
When the house genuinely needs to get bigger rather than rearranged, we will say so and point you at additions instead. Most calls we take, though, turn out to be interior work — the space is usually already there.
The most-asked question in any open-concept remodel is whether a wall can come out. Almost always, yes — but the wall was holding something up, and that load has to go somewhere. Here is the whole story in one drawing.
Adjustable steel posts carry the joists on both sides of the wall before anything comes out. Nothing is removed until the load is held.
Sized by an engineer for the span and what is above it — roof, second floor, or both. A flush beam hides in the ceiling; a drop beam is faster and cheaper.
The old wall spread the load across a dozen studs. A beam collects it into two posts, which is why the posts and what is under them matter so much.
Each post must land on something real — a beam in the basement, a new pier, or the existing footing. We trace it to the ground before quoting, never after.
A finished basement fails from the concrete side, not the paint side. This is the wall we build — six layers, each one there for a reason.
The concrete or block you already have. We check it for cracks, efflorescence and damp before anything covers it.
A dimpled membrane against the wall lets any moisture that ever comes through drain down and dry, instead of soaking your framing.
Continuous rigid foam against the mat keeps the warm room air off the cold concrete — that is where condensation, and then mold, starts.
Studs stand an inch or more off the concrete so wood never touches masonry. Bottom plates get a capillary break.
Batts or dense-pack in the stud bays bring the wall to code. The foam behind it is what stops the batts from ever getting damp.
Moisture-resistant board, gapped off the floor. If the slab ever takes on water, the wall does not wick it up.
Before we finish any basement we test for moisture and radon. This part of Pennsylvania sits on geology that produces both, and neither one is expensive to deal with before the walls go up — sealing a slab and running a radon stub now costs a fraction of opening a finished wall later.
Every room has its own version of the work. Where a room has a page of its own on this site, the link is in the text.
The cheapest finished square footage in the house, if the moisture details are done right. Family rooms, spare bedrooms, laundry and workshops — always with the wall stack below, and radon and moisture testing first.
Opening walls, new flooring, trim, lighting and built-ins. Most living-room projects are really about the kitchen next to them — our kitchen remodeling page covers that side of the wall.
Closets rebuilt, walls moved to steal space from a landing, a bathroom added where a dressing room was. Bedroom work is usually the quiet part of a larger remodel.
Moving the washer upstairs is one of the most-requested changes in a two-storey home. It means new plumbing runs, a drain pan, and real venting — a day of rough-in that pays off for decades.
The hardest-working twelve square feet in a Pennsylvania house: durable floor, a bench with hooks, a closet that actually closes. Often built as part of a rear addition or an entry rework.
Powder rooms, hall baths and primary suites are their own trade — tile, waterproofing and plumbing in a small box. The bathroom page has the full picture, including tub-to-shower conversions.
When you are doing everything at once — floors, walls, kitchen, baths — the sequence is the difference between a four-month project and a nine-month one. Work runs heavy-to-light and top-down: structure first, finishes last, and nothing painted before the sawdust is done.
The order also decides whether you can stay in the house. We phase whole-home work so you always have a bathroom and somewhere to make coffee, and we tell you before we start which two weeks you would rather spend somewhere else.
Walls come out or move first, beams go in, and any new openings are framed before anything finish-grade starts.
Plumbing, electrical and HVAC rough-ins run while everything is open — the only time they are cheap to change.
Rough inspections, then insulation and drywall. From here the house starts looking like a house again.
Flooring and tile before cabinets and trim, fixtures and paint last. Working top-down and heavy-to-light keeps finished work out of harm's way.
Most whole-floor renovations end up including a kitchen remodel and at least one bathroom rebuild, and when the floor plan simply runs out of room we price an addition beside it so you can compare. We run this same work in the city — see interior renovations in Harrisburg for how older rowhomes change the sequence.
Tell us which rooms are bothering you and we'll walk the house, then put a fixed written scope in front of you.